Drywall

Drywall hangs, tapes, and finishes gypsum board to create smooth interior walls and ceilings, and repairs holes or damage. Finish quality and dust control are the main concerns, and it is priced per square foot.

Find drywall pros

How drywall is done

  1. Measure and cut the drywall sheets
  2. Hang panels on framing and fasten
  3. Tape the seams and apply joint compound
  4. Apply and sand successive mud coats
  5. Match the surface texture
  6. Prime for paint

What homeowners should know

  • Ask about the finish level, since a smooth level 5 costs more
  • Expect and plan for sanding dust throughout the space
  • Confirm texture matching for repairs and patches
  • Understand that mud coats need drying time between passes
  • Have them prime before you paint for even coverage

Permits, timelines & things to consider

  • New construction and additions may require inspections before drywall
  • Finish level and texture matching drive the per-square-foot cost
  • Multiple mud-and-sand cycles take days to complete
  • Moisture-resistant board is needed in wet areas
  • Dust control matters in occupied homes

Frequently asked questions

How long does drywall finishing take?

Hanging is quick, but taping and mudding require several drying cycles, so a typical room takes a few days to a week.

What is a level 5 finish?

Level 5 is the smoothest drywall finish, with a skim coat over the entire surface, used where lighting or high-gloss paint would reveal imperfections.

Can drywall get wet?

Standard drywall degrades with moisture, so bathrooms and other wet areas need moisture-resistant or cement board instead.